トップページに戻る


電子メール
ASAP = as soon as possible
BFN = Bye for now.
BTW = by the way
HTH = Hope this helps.
IMO = in my opinion
IOW = in other words.
NRN = no reply necessary
OTOH = on the other hand
SOL = sooner or later
SYL = See you later.
TTYL = Talk to you later.

単位
psi = pounds per square inch
ksi = kilo-pounds per square inch
mph = miles per hour

建築
ABBREV. = abbreviation
A.B. = anchor bolts
ACST.= acoustic
ALUM. = aluminum
ASB. = asbestos
ASCE = American Society of Civil Engineers
ASPH. = asphalt
@ = at

BLDG. = building
BOT. = bottom
BS = British Standard
BTWN. = between

CAB. = cabinet
CEM. = cement
COL. = column
CONC. = concrete
DIA. = diameter
DIM. = dimension
DN. = down
DO. = ditto

EL. = elevation
ELEV. = elevator
EQ. = equal
EQUIP. = equipment

FDN. = foundation
FL. = floor
FTG. = footing

GL. = glass
G.PL = gusset plate
GR. = grade

HOR. = horizontal
HSB = high strength bolt

IN. = inch or inches

JT. = joint

LAB. = laboratory
LAD. = ladder
LB. = pound
LIN = linear
LTG. = lighting

MAX. = maximum
MAT'L = material
MECH. = mechanical
MET. = metal
MIN. = minimum

NO. = number
NOS. = numbers
NOM. = nominal

OZ. = ounce

PL. = plate
PVC = polyvinyl chloride

RC = reinforced concrete
RF. = roof
RM. =room
RND. = round

S.PL = splice plate
S/S = stainless steel
ST. stairs
STA. = stainless
STD. = standard
STL. = steel

TEL. = telephone
TYP. = typical

VENT. = ventilation
VERT. = vertical
VOL. = volume

WD. = wood
WDW = window
WWT = waste water treatment
WT. = weight
W/ = with
W/O = without

YD. = yard


   トップページに戻る